Saltmere Harbour rules

This copy was served as fetch fx-hkyaaqig.

These rules are made by the harbour authority under its general powers and apply from the start of the season. Each Part covers one subject, and the schedules at the end of a Part set out what applies at each pontoon, quay, mooring or bay.

Part 1. General

1.1 These rules apply to every vessel, person and vehicle within the limits of Saltmere Harbour, which run from the outer mole light to the head of the tidal basin, and to the quays, pontoons, slipways and hard standing inside those limits.

1.2 The harbour master may give directions to any vessel in the harbour, and a direction given by radio, by a member of staff in person or by a notice on a pontoon gate has the same force as these rules.

1.3 Saltmere Control keeps a listening watch on VHF channel 71 at all hours, and a vessel arriving between sunset and sunrise gives its name and the night arrival code zq-qfxiuwnc before it passes the outer mole light.

1.4 In these rules a berth holder is a person who holds an annual or seasonal berth agreement, and a visitor is the skipper of any other vessel that stays in the harbour for more than four hours.

1.5 Nothing in these rules relieves a skipper of the duty to keep a proper lookout and to follow the collision regulations.

Schedule 1A: North quay wall, bollards 1 to 12

1A.1 Vessels lie alongside the North quay wall between bollards 1 and 12 no more than 2 deep.

1A.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

1A.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

1A.4 Fender boards are used against the wall here, as the timber facing is uneven.

1A.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

1A.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 1B: Swinging moorings 1 to 20, upper pool

1B.1 Moorings 1 to 20 in the upper pool take vessels of up to 7 metres.

1B.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second autumn.

1B.3 The pick-up buoys in this trot are orange, and each carries its mooring number.

1B.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

1B.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

1B.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 1C: Bay 1 of the hard standing

1C.1 Bay 1 holds boats of up to 10 tonnes on the yard's own cradles.

1C.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

1C.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

1C.4 Covers are tied down with rope, not with weights hung from the rail.

1C.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

1C.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 1D: Pontoon A, berths 1 to 30

1D.1 Berths 1 to 30 on Pontoon A take vessels of up to 15 metres overall and 3 metres beam.

1D.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

1D.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 10 metres.

1D.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

1D.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

1D.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

1D.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Schedule 1E: South quay wall, bollards 1 to 12

1E.1 Vessels lie alongside the South quay wall between bollards 1 and 12 no more than 2 deep.

1E.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

1E.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

1E.4 Fender boards are used against the wall here, as the timber facing is uneven.

1E.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

1E.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 1F: Swinging moorings 1 to 20, lower pool

1F.1 Moorings 1 to 20 in the lower pool take vessels of up to 10 metres.

1F.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every autumn.

1F.3 The pick-up buoys in this trot are orange, and each carries its mooring number.

1F.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

1F.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

1F.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 1G: Bay 2 of the hard standing

1G.1 Bay 2 holds boats of up to 5 tonnes on the yard's own cradles.

1G.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

1G.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

1G.4 Covers are tied down with rope, not with weights hung from the rail.

1G.5 The bay is kept clear for the lifting trailer on Friday mornings.

1G.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 1H: Pontoon B, berths 1 to 30

1H.1 Berths 1 to 30 on Pontoon B take vessels of up to 15 metres overall and 5 metres beam.

1H.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

1H.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

1H.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

1H.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

1H.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

1H.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 1I: East quay wall, bollards 1 to 12

1I.1 Vessels lie alongside the East quay wall between bollards 1 and 12 no more than 4 deep.

1I.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

1I.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

1I.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

1I.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

1I.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 1J: Swinging moorings 1 to 20, outer pool

1J.1 Moorings 1 to 20 in the outer pool take vessels of up to 10 metres.

1J.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every spring.

1J.3 The pick-up buoys in this trot are white, and each carries its mooring number.

1J.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

1J.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

1J.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 1K: Bay 3 of the hard standing

1K.1 Bay 3 holds boats of up to 4 tonnes on the yard's own cradles.

1K.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

1K.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

1K.4 Covers are tied down with rope, not with weights hung from the rail.

1K.5 The bay is kept clear for the lifting trailer on Thursday mornings.

1K.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 1L: Pontoon C, berths 1 to 30

1L.1 Berths 1 to 30 on Pontoon C take vessels of up to 11 metres overall and 3 metres beam.

1L.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

1L.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 15 metres.

1L.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

1L.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

1L.6 The pontoon is inspected on Thursday mornings, and a loose cleat or a split board is reported to the office the same day.

1L.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 1M: West quay wall, bollards 1 to 12

1M.1 Vessels lie alongside the West quay wall between bollards 1 and 12 no more than 2 deep.

1M.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

1M.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

1M.4 Fender boards are used against the wall here, as the timber facing is uneven.

1M.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

1M.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 1N: Swinging moorings 1 to 20, river reach

1N.1 Moorings 1 to 20 in the river reach take vessels of up to 13 metres.

1N.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every autumn.

1N.3 The pick-up buoys in this trot are white, and each carries its mooring number.

1N.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

1N.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

1N.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 1O: Bay 4 of the hard standing

1O.1 Bay 4 holds boats of up to 7 tonnes on the yard's own cradles.

1O.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

1O.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

1O.4 Covers are tied down with rope, not with weights hung from the rail.

1O.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

1O.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 1P: Pontoon D, berths 1 to 30

1P.1 Berths 1 to 30 on Pontoon D take vessels of up to 13 metres overall and 4 metres beam.

1P.2 Each finger on this pontoon is 7 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

1P.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 15 metres.

1P.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

1P.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

1P.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

1P.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Part 2. Arrival and departure

2.1 A visitor reports to the harbour office within two hours of making fast, or by half past nine the next morning when arriving after the office has closed.

2.2 At the office the visitor shows:

2.3 A visitor who leaves before paying is invoiced at the full daily rate for every night shown on the berth plan, whether or not the berth was used.

2.4 Departures are reported in person or by radio before the vessel leaves its berth.

Schedule 2A: Fish quay wall, bollards 1 to 12

2A.1 Vessels lie alongside the Fish quay wall between bollards 1 and 12 no more than 4 deep.

2A.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

2A.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

2A.4 Fender boards are used against the wall here, as the timber facing is rough.

2A.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

2A.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 2B: Swinging moorings 1 to 20, creek

2B.1 Moorings 1 to 20 in the creek take vessels of up to 13 metres.

2B.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second autumn.

2B.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

2B.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

2B.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

2B.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 2C: Bay 5 of the hard standing

2C.1 Bay 5 holds boats of up to 12 tonnes on the yard's own cradles.

2C.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

2C.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

2C.4 Covers are tied down with rope, not with weights hung from the rail.

2C.5 The bay is kept clear for the lifting trailer on Friday mornings.

2C.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 2D: Pontoon E, berths 1 to 30

2D.1 Berths 1 to 30 on Pontoon E take vessels of up to 10 metres overall and 3 metres beam.

2D.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

2D.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 15 metres.

2D.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

2D.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

2D.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

2D.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 2E: Custom House quay wall, bollards 1 to 12

2E.1 Vessels lie alongside the Custom House quay wall between bollards 1 and 12 no more than 3 deep.

2E.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

2E.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

2E.4 Fender boards are used against the wall here, as the timber facing is rough.

2E.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

2E.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 2F: Swinging moorings 21 to 40, upper pool

2F.1 Moorings 21 to 40 in the upper pool take vessels of up to 11 metres.

2F.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every autumn.

2F.3 The pick-up buoys in this trot are white, and each carries its mooring number.

2F.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

2F.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

2F.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 2G: Bay 6 of the hard standing

2G.1 Bay 6 holds boats of up to 9 tonnes on the yard's own cradles.

2G.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

2G.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

2G.4 Covers are tied down with rope, not with weights hung from the rail.

2G.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

2G.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 2H: Pontoon F, berths 1 to 30

2H.1 Berths 1 to 30 on Pontoon F take vessels of up to 10 metres overall and 5 metres beam.

2H.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

2H.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 20 metres.

2H.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

2H.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

2H.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

2H.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 2I: Old quay wall, bollards 1 to 12

2I.1 Vessels lie alongside the Old quay wall between bollards 1 and 12 no more than 4 deep.

2I.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

2I.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

2I.4 Fender boards are used against the wall here, as the timber facing is uneven.

2I.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

2I.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 2J: Swinging moorings 21 to 40, lower pool

2J.1 Moorings 21 to 40 in the lower pool take vessels of up to 13 metres.

2J.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second autumn.

2J.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

2J.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

2J.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

2J.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 2K: Bay 7 of the hard standing

2K.1 Bay 7 holds boats of up to 8 tonnes on the yard's own cradles.

2K.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

2K.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

2K.4 Covers are tied down with rope, not with weights hung from the rail.

2K.5 The bay is kept clear for the lifting trailer on Thursday mornings.

2K.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 2L: Pontoon G, berths 1 to 30

2L.1 Berths 1 to 30 on Pontoon G take vessels of up to 8 metres overall and 5 metres beam.

2L.2 Each finger on this pontoon is 6 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

2L.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 20 metres.

2L.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

2L.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

2L.6 The pontoon is inspected on Thursday mornings, and a loose cleat or a split board is reported to the office the same day.

2L.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 2M: Ferry quay wall, bollards 1 to 12

2M.1 Vessels lie alongside the Ferry quay wall between bollards 1 and 12 no more than 3 deep.

2M.2 Ladders are set into the wall every 20 metres; a vessel never lies across the foot of a ladder.

2M.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

2M.4 Fender boards are used against the wall here, as the timber facing is worn.

2M.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

2M.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 2N: Swinging moorings 21 to 40, outer pool

2N.1 Moorings 21 to 40 in the outer pool take vessels of up to 8 metres.

2N.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second spring.

2N.3 The pick-up buoys in this trot are orange, and each carries its mooring number.

2N.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

2N.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

2N.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 2O: Bay 8 of the hard standing

2O.1 Bay 8 holds boats of up to 11 tonnes on the yard's own cradles.

2O.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

2O.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

2O.4 Covers are tied down with rope, not with weights hung from the rail.

2O.5 The bay is kept clear for the lifting trailer on Monday mornings.

2O.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 2P: Pontoon H, berths 1 to 30

2P.1 Berths 1 to 30 on Pontoon H take vessels of up to 15 metres overall and 4 metres beam.

2P.2 Each finger on this pontoon is 6 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

2P.3 Shore power posts stand between every 4 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 20 metres.

2P.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

2P.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

2P.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

2P.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Schedule 2Q: North quay wall, bollards 13 to 24

2Q.1 Vessels lie alongside the North quay wall between bollards 13 and 24 no more than 2 deep.

2Q.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

2Q.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

2Q.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

2Q.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

2Q.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 2R: Swinging moorings 21 to 40, river reach

2R.1 Moorings 21 to 40 in the river reach take vessels of up to 13 metres.

2R.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second autumn.

2R.3 The pick-up buoys in this trot are white, and each carries its mooring number.

2R.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

2R.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

2R.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Part 3. Slipway and hard standing

3.1 The public slipway is open from two hours before to two hours after high water, and launching outside those times is at the user's own risk.

3.2 A tender or dinghy left on the slipway rack for more than 14 days is moved to the compound behind Shed C, and is released only against form zq-izqzvafg and a handling fee of 27 euros.

3.3 Vehicles and trailers are parked in the upper car park once the boat is afloat, never on the slipway apron.

3.4 Boats on the hard standing stand on cradles or on at least four props, chained in pairs.

Schedule 3A: Bay 9 of the hard standing

3A.1 Bay 9 holds boats of up to 7 tonnes on the yard's own cradles.

3A.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

3A.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

3A.4 Covers are tied down with rope, not with weights hung from the rail.

3A.5 The bay is kept clear for the lifting trailer on Thursday mornings.

3A.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 3B: Pontoon I, berths 1 to 30

3B.1 Berths 1 to 30 on Pontoon I take vessels of up to 15 metres overall and 4 metres beam.

3B.2 Each finger on this pontoon is 8 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

3B.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

3B.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

3B.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

3B.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

3B.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 3C: South quay wall, bollards 13 to 24

3C.1 Vessels lie alongside the South quay wall between bollards 13 and 24 no more than 3 deep.

3C.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

3C.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

3C.4 Fender boards are used against the wall here, as the timber facing is uneven.

3C.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

3C.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 3D: Swinging moorings 21 to 40, creek

3D.1 Moorings 21 to 40 in the creek take vessels of up to 11 metres.

3D.2 Each mooring has a ground chain of 25 millimetres and a riser that is lifted and inspected every second autumn.

3D.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

3D.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

3D.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

3D.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 3E: Bay 10 of the hard standing

3E.1 Bay 10 holds boats of up to 9 tonnes on the yard's own cradles.

3E.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

3E.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

3E.4 Covers are tied down with rope, not with weights hung from the rail.

3E.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

3E.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 3F: Pontoon J, berths 1 to 30

3F.1 Berths 1 to 30 on Pontoon J take vessels of up to 8 metres overall and 5 metres beam.

3F.2 Each finger on this pontoon is 8 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

3F.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

3F.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

3F.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

3F.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

3F.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 3G: East quay wall, bollards 13 to 24

3G.1 Vessels lie alongside the East quay wall between bollards 13 and 24 no more than 4 deep.

3G.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

3G.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

3G.4 Fender boards are used against the wall here, as the timber facing is uneven.

3G.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

3G.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 3H: Swinging moorings 41 to 60, upper pool

3H.1 Moorings 41 to 60 in the upper pool take vessels of up to 11 metres.

3H.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second spring.

3H.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

3H.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

3H.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

3H.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 3I: Bay 11 of the hard standing

3I.1 Bay 11 holds boats of up to 4 tonnes on the yard's own cradles.

3I.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

3I.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

3I.4 Covers are tied down with rope, not with weights hung from the rail.

3I.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

3I.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 3J: Pontoon K, berths 1 to 30

3J.1 Berths 1 to 30 on Pontoon K take vessels of up to 15 metres overall and 5 metres beam.

3J.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

3J.3 Shore power posts stand between every 2 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 20 metres.

3J.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

3J.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

3J.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

3J.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 3K: West quay wall, bollards 13 to 24

3K.1 Vessels lie alongside the West quay wall between bollards 13 and 24 no more than 3 deep.

3K.2 Ladders are set into the wall every 20 metres; a vessel never lies across the foot of a ladder.

3K.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

3K.4 Fender boards are used against the wall here, as the timber facing is rough.

3K.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

3K.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 3L: Swinging moorings 41 to 60, lower pool

3L.1 Moorings 41 to 60 in the lower pool take vessels of up to 8 metres.

3L.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every autumn.

3L.3 The pick-up buoys in this trot are white, and each carries its mooring number.

3L.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

3L.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

3L.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 3M: Bay 12 of the hard standing

3M.1 Bay 12 holds boats of up to 8 tonnes on the yard's own cradles.

3M.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

3M.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

3M.4 Covers are tied down with rope, not with weights hung from the rail.

3M.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

3M.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 3N: Pontoon L, berths 1 to 30

3N.1 Berths 1 to 30 on Pontoon L take vessels of up to 10 metres overall and 4 metres beam.

3N.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

3N.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

3N.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

3N.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

3N.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

3N.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 3O: Fish quay wall, bollards 13 to 24

3O.1 Vessels lie alongside the Fish quay wall between bollards 13 and 24 no more than 3 deep.

3O.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

3O.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

3O.4 Fender boards are used against the wall here, as the timber facing is rough.

3O.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

3O.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 3P: Swinging moorings 41 to 60, outer pool

3P.1 Moorings 41 to 60 in the outer pool take vessels of up to 13 metres.

3P.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every spring.

3P.3 The pick-up buoys in this trot are white, and each carries its mooring number.

3P.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

3P.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

3P.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 3Q: Bay 13 of the hard standing

3Q.1 Bay 13 holds boats of up to 5 tonnes on the yard's own cradles.

3Q.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

3Q.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

3Q.4 Covers are tied down with rope, not with weights hung from the rail.

3Q.5 The bay is kept clear for the lifting trailer on Friday mornings.

3Q.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 3R: Pontoon M, berths 1 to 30

3R.1 Berths 1 to 30 on Pontoon M take vessels of up to 16 metres overall and 5 metres beam.

3R.2 Each finger on this pontoon is 8 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

3R.3 Shore power posts stand between every 3 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 10 metres.

3R.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

3R.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

3R.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

3R.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Schedule 3S: Custom House quay wall, bollards 13 to 24

3S.1 Vessels lie alongside the Custom House quay wall between bollards 13 and 24 no more than 3 deep.

3S.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

3S.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

3S.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

3S.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

3S.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Part 4. Fuel and services

4.1 Fresh water, shore power and the pump-out station are included in the berth fee for berth holders and charged to visitors by the night.

4.2 The fuel berth on the east wall sells diesel only, closes at 19:30 from 1 October to 31 March, and its card terminal accepts only cards that carry the fleet prefix zq-mghvaeoo.

4.3 Spills, however small, are reported to the office at once, and absorbent pads are kept in the yellow bin beside the pump.

4.4 Waste oil goes into the tank in the compound, never into the general waste.

Schedule 4A: Swinging moorings 41 to 60, river reach

4A.1 Moorings 41 to 60 in the river reach take vessels of up to 9 metres.

4A.2 Each mooring has a ground chain of 25 millimetres and a riser that is lifted and inspected every second spring.

4A.3 The pick-up buoys in this trot are white, and each carries its mooring number.

4A.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

4A.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

4A.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 4B: Bay 14 of the hard standing

4B.1 Bay 14 holds boats of up to 7 tonnes on the yard's own cradles.

4B.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

4B.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

4B.4 Covers are tied down with rope, not with weights hung from the rail.

4B.5 The bay is kept clear for the lifting trailer on Monday mornings.

4B.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 4C: Pontoon N, berths 1 to 30

4C.1 Berths 1 to 30 on Pontoon N take vessels of up to 12 metres overall and 3 metres beam.

4C.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

4C.3 Shore power posts stand between every 4 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 10 metres.

4C.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

4C.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

4C.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

4C.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 4D: Old quay wall, bollards 13 to 24

4D.1 Vessels lie alongside the Old quay wall between bollards 13 and 24 no more than 2 deep.

4D.2 Ladders are set into the wall every 20 metres; a vessel never lies across the foot of a ladder.

4D.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

4D.4 Fender boards are used against the wall here, as the timber facing is uneven.

4D.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

4D.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 4E: Swinging moorings 41 to 60, creek

4E.1 Moorings 41 to 60 in the creek take vessels of up to 14 metres.

4E.2 Each mooring has a ground chain of 25 millimetres and a riser that is lifted and inspected every second autumn.

4E.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

4E.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

4E.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

4E.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 4F: Bay 15 of the hard standing

4F.1 Bay 15 holds boats of up to 9 tonnes on the yard's own cradles.

4F.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

4F.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

4F.4 Covers are tied down with rope, not with weights hung from the rail.

4F.5 The bay is kept clear for the lifting trailer on Friday mornings.

4F.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 4G: Pontoon O, berths 1 to 30

4G.1 Berths 1 to 30 on Pontoon O take vessels of up to 10 metres overall and 4 metres beam.

4G.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

4G.3 Shore power posts stand between every 2 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

4G.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

4G.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

4G.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

4G.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 4H: Ferry quay wall, bollards 13 to 24

4H.1 Vessels lie alongside the Ferry quay wall between bollards 13 and 24 no more than 3 deep.

4H.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

4H.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

4H.4 Fender boards are used against the wall here, as the timber facing is uneven.

4H.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

4H.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 4I: Swinging moorings 61 to 80, upper pool

4I.1 Moorings 61 to 80 in the upper pool take vessels of up to 8 metres.

4I.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second spring.

4I.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

4I.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

4I.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

4I.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 4J: Bay 16 of the hard standing

4J.1 Bay 16 holds boats of up to 6 tonnes on the yard's own cradles.

4J.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

4J.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

4J.4 Covers are tied down with rope, not with weights hung from the rail.

4J.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

4J.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 4K: Pontoon P, berths 1 to 30

4K.1 Berths 1 to 30 on Pontoon P take vessels of up to 14 metres overall and 4 metres beam.

4K.2 Each finger on this pontoon is 7 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

4K.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 10 metres.

4K.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

4K.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

4K.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

4K.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Part 5. Navigation in the harbour

5.1 The speed limit inside the outer mole is four knots, and no vessel may make a wash that disturbs moored craft.

5.2 The sill of the inner basin dries at low water springs; the gauge at the lock reads 2.3 metres at chart datum, so the greatest draught allowed into the basin is 2.1 metres, and a deeper vessel enters only under pilotage waiver zq-mpzgrdre.

5.3 Sailing inside the harbour is allowed only for small boats taking part in club training.

5.4 Anchoring is forbidden in the fairway and close to any pontoon.

Schedule 5A: North quay wall, bollards 25 to 36

5A.1 Vessels lie alongside the North quay wall between bollards 25 and 36 no more than 4 deep.

5A.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

5A.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

5A.4 Fender boards are used against the wall here, as the timber facing is uneven.

5A.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

5A.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 5B: Swinging moorings 61 to 80, lower pool

5B.1 Moorings 61 to 80 in the lower pool take vessels of up to 9 metres.

5B.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second autumn.

5B.3 The pick-up buoys in this trot are white, and each carries its mooring number.

5B.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

5B.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

5B.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 5C: Bay 17 of the hard standing

5C.1 Bay 17 holds boats of up to 10 tonnes on the yard's own cradles.

5C.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

5C.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

5C.4 Covers are tied down with rope, not with weights hung from the rail.

5C.5 The bay is kept clear for the lifting trailer on Monday mornings.

5C.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 5D: Pontoon Q, berths 1 to 30

5D.1 Berths 1 to 30 on Pontoon Q take vessels of up to 10 metres overall and 4 metres beam.

5D.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

5D.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

5D.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

5D.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

5D.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

5D.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 5E: South quay wall, bollards 25 to 36

5E.1 Vessels lie alongside the South quay wall between bollards 25 and 36 no more than 4 deep.

5E.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

5E.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

5E.4 Fender boards are used against the wall here, as the timber facing is rough.

5E.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

5E.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 5F: Swinging moorings 61 to 80, outer pool

5F.1 Moorings 61 to 80 in the outer pool take vessels of up to 9 metres.

5F.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second autumn.

5F.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

5F.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

5F.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

5F.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 5G: Bay 18 of the hard standing

5G.1 Bay 18 holds boats of up to 6 tonnes on the yard's own cradles.

5G.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

5G.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

5G.4 Covers are tied down with rope, not with weights hung from the rail.

5G.5 The bay is kept clear for the lifting trailer on Thursday mornings.

5G.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 5H: Pontoon R, berths 1 to 30

5H.1 Berths 1 to 30 on Pontoon R take vessels of up to 16 metres overall and 3 metres beam.

5H.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

5H.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 15 metres.

5H.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

5H.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

5H.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

5H.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 5I: East quay wall, bollards 25 to 36

5I.1 Vessels lie alongside the East quay wall between bollards 25 and 36 no more than 4 deep.

5I.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

5I.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

5I.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

5I.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

5I.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 5J: Swinging moorings 61 to 80, river reach

5J.1 Moorings 61 to 80 in the river reach take vessels of up to 8 metres.

5J.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every spring.

5J.3 The pick-up buoys in this trot are green, and each carries its mooring number.

5J.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

5J.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

5J.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 5K: Bay 19 of the hard standing

5K.1 Bay 19 holds boats of up to 10 tonnes on the yard's own cradles.

5K.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

5K.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

5K.4 Covers are tied down with rope, not with weights hung from the rail.

5K.5 The bay is kept clear for the lifting trailer on Thursday mornings.

5K.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 5L: Pontoon S, berths 1 to 30

5L.1 Berths 1 to 30 on Pontoon S take vessels of up to 8 metres overall and 4 metres beam.

5L.2 Each finger on this pontoon is 6 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

5L.3 Shore power posts stand between every 2 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

5L.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

5L.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

5L.6 The pontoon is inspected on Thursday mornings, and a loose cleat or a split board is reported to the office the same day.

5L.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Part 6. Winter storage

6.1 Boats are stored ashore from 1 October to 30 April on the terms in the table below, charged by the week and by length overall.

Weekly winter storage rates
Length overallRate per week (euros)Tariff code
up to 6.00 m18.40zq-flbyasol
6.01 to 8.00 m26.90zq-rfewicbr
8.01 to 10.00 m37.20zq-uklzqvgx
10.01 to 12.00 m48.70zq-yogajbce
12.01 to 14.00 m61.80zq-fktymhez
14.01 to 16.00 m77.30zq-xwzxjogf
over 16.00 mby quotationnone

6.2 A boat stays ashore beyond 30 April only with the written consent of the yard foreman.

6.3 Masts are stored in the rack along the north fence and labelled with the boat's name.

Schedule 6A: West quay wall, bollards 25 to 36

6A.1 Vessels lie alongside the West quay wall between bollards 25 and 36 no more than 2 deep.

6A.2 Ladders are set into the wall every 20 metres; a vessel never lies across the foot of a ladder.

6A.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

6A.4 Fender boards are used against the wall here, as the timber facing is rough.

6A.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

6A.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 6B: Swinging moorings 61 to 80, creek

6B.1 Moorings 61 to 80 in the creek take vessels of up to 10 metres.

6B.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every spring.

6B.3 The pick-up buoys in this trot are green, and each carries its mooring number.

6B.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

6B.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

6B.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 6C: Bay 20 of the hard standing

6C.1 Bay 20 holds boats of up to 10 tonnes on the yard's own cradles.

6C.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

6C.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

6C.4 Covers are tied down with rope, not with weights hung from the rail.

6C.5 The bay is kept clear for the lifting trailer on Thursday mornings.

6C.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 6D: Pontoon T, berths 1 to 30

6D.1 Berths 1 to 30 on Pontoon T take vessels of up to 15 metres overall and 4 metres beam.

6D.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

6D.3 Shore power posts stand between every 2 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

6D.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

6D.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

6D.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

6D.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 6E: Fish quay wall, bollards 25 to 36

6E.1 Vessels lie alongside the Fish quay wall between bollards 25 and 36 no more than 4 deep.

6E.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

6E.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

6E.4 Fender boards are used against the wall here, as the timber facing is uneven.

6E.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

6E.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 6F: Swinging moorings 81 to 100, upper pool

6F.1 Moorings 81 to 100 in the upper pool take vessels of up to 9 metres.

6F.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every autumn.

6F.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

6F.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

6F.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

6F.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 6G: Bay 21 of the hard standing

6G.1 Bay 21 holds boats of up to 9 tonnes on the yard's own cradles.

6G.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

6G.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

6G.4 Covers are tied down with rope, not with weights hung from the rail.

6G.5 The bay is kept clear for the lifting trailer on Friday mornings.

6G.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 6H: Pontoon A, berths 31 to 60

6H.1 Berths 31 to 60 on Pontoon A take vessels of up to 9 metres overall and 3 metres beam.

6H.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

6H.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 15 metres.

6H.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

6H.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

6H.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

6H.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 6I: Custom House quay wall, bollards 25 to 36

6I.1 Vessels lie alongside the Custom House quay wall between bollards 25 and 36 no more than 4 deep.

6I.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

6I.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

6I.4 Fender boards are used against the wall here, as the timber facing is uneven.

6I.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

6I.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 6J: Swinging moorings 81 to 100, lower pool

6J.1 Moorings 81 to 100 in the lower pool take vessels of up to 8 metres.

6J.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second spring.

6J.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

6J.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

6J.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

6J.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 6K: Bay 22 of the hard standing

6K.1 Bay 22 holds boats of up to 9 tonnes on the yard's own cradles.

6K.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

6K.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

6K.4 Covers are tied down with rope, not with weights hung from the rail.

6K.5 The bay is kept clear for the lifting trailer on Monday mornings.

6K.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 6L: Pontoon B, berths 31 to 60

6L.1 Berths 31 to 60 on Pontoon B take vessels of up to 8 metres overall and 3 metres beam.

6L.2 Each finger on this pontoon is 7 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

6L.3 Shore power posts stand between every 3 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 15 metres.

6L.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

6L.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

6L.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

6L.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Part 7. Living aboard

7.1 A berth holder may live aboard only with a permit from the harbour master, renewed every twelve months.

7.2 No more than 9 liveaboard permits are in force at any one time, and the waiting list is kept by the berthing master in register zq-ypzcqnbl.

7.3 A vessel lived on keeps its own holding tank and uses the pump-out station at least once a week.

Schedule 7A: Old quay wall, bollards 25 to 36

7A.1 Vessels lie alongside the Old quay wall between bollards 25 and 36 no more than 3 deep.

7A.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

7A.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

7A.4 Fender boards are used against the wall here, as the timber facing is worn.

7A.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

7A.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 7B: Swinging moorings 81 to 100, outer pool

7B.1 Moorings 81 to 100 in the outer pool take vessels of up to 14 metres.

7B.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second autumn.

7B.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

7B.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

7B.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

7B.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 7C: Bay 23 of the hard standing

7C.1 Bay 23 holds boats of up to 4 tonnes on the yard's own cradles.

7C.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

7C.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

7C.4 Covers are tied down with rope, not with weights hung from the rail.

7C.5 The bay is kept clear for the lifting trailer on Thursday mornings.

7C.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 7D: Pontoon C, berths 31 to 60

7D.1 Berths 31 to 60 on Pontoon C take vessels of up to 10 metres overall and 3 metres beam.

7D.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

7D.3 Shore power posts stand between every 3 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 20 metres.

7D.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

7D.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

7D.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

7D.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 7E: Ferry quay wall, bollards 25 to 36

7E.1 Vessels lie alongside the Ferry quay wall between bollards 25 and 36 no more than 3 deep.

7E.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

7E.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

7E.4 Fender boards are used against the wall here, as the timber facing is rough.

7E.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

7E.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 7F: Swinging moorings 81 to 100, river reach

7F.1 Moorings 81 to 100 in the river reach take vessels of up to 9 metres.

7F.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every spring.

7F.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

7F.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

7F.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

7F.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 7G: Bay 24 of the hard standing

7G.1 Bay 24 holds boats of up to 8 tonnes on the yard's own cradles.

7G.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

7G.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

7G.4 Covers are tied down with rope, not with weights hung from the rail.

7G.5 The bay is kept clear for the lifting trailer on Monday mornings.

7G.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 7H: Pontoon D, berths 31 to 60

7H.1 Berths 31 to 60 on Pontoon D take vessels of up to 11 metres overall and 3 metres beam.

7H.2 Each finger on this pontoon is 7 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

7H.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 10 metres.

7H.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

7H.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

7H.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

7H.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Schedule 7I: North quay wall, bollards 37 to 48

7I.1 Vessels lie alongside the North quay wall between bollards 37 and 48 no more than 3 deep.

7I.2 Ladders are set into the wall every 20 metres; a vessel never lies across the foot of a ladder.

7I.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

7I.4 Fender boards are used against the wall here, as the timber facing is uneven.

7I.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

7I.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 7J: Swinging moorings 81 to 100, creek

7J.1 Moorings 81 to 100 in the creek take vessels of up to 8 metres.

7J.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second spring.

7J.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

7J.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

7J.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

7J.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 7K: Bay 25 of the hard standing

7K.1 Bay 25 holds boats of up to 5 tonnes on the yard's own cradles.

7K.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

7K.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

7K.4 Covers are tied down with rope, not with weights hung from the rail.

7K.5 The bay is kept clear for the lifting trailer on Monday mornings.

7K.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 7L: Pontoon E, berths 31 to 60

7L.1 Berths 31 to 60 on Pontoon E take vessels of up to 10 metres overall and 3 metres beam.

7L.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

7L.3 Shore power posts stand between every 2 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 15 metres.

7L.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

7L.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

7L.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

7L.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 7M: South quay wall, bollards 37 to 48

7M.1 Vessels lie alongside the South quay wall between bollards 37 and 48 no more than 4 deep.

7M.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

7M.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

7M.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

7M.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

7M.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 7N: Swinging moorings 101 to 120, upper pool

7N.1 Moorings 101 to 120 in the upper pool take vessels of up to 7 metres.

7N.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second autumn.

7N.3 The pick-up buoys in this trot are orange, and each carries its mooring number.

7N.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

7N.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

7N.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 7O: Bay 26 of the hard standing

7O.1 Bay 26 holds boats of up to 4 tonnes on the yard's own cradles.

7O.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

7O.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

7O.4 Covers are tied down with rope, not with weights hung from the rail.

7O.5 The bay is kept clear for the lifting trailer on Thursday mornings.

7O.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 7P: Pontoon F, berths 31 to 60

7P.1 Berths 31 to 60 on Pontoon F take vessels of up to 10 metres overall and 3 metres beam.

7P.2 Each finger on this pontoon is 8 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

7P.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

7P.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

7P.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

7P.6 The pontoon is inspected on Thursday mornings, and a loose cleat or a split board is reported to the office the same day.

7P.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 7Q: East quay wall, bollards 37 to 48

7Q.1 Vessels lie alongside the East quay wall between bollards 37 and 48 no more than 3 deep.

7Q.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

7Q.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

7Q.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

7Q.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

7Q.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 7R: Swinging moorings 101 to 120, lower pool

7R.1 Moorings 101 to 120 in the lower pool take vessels of up to 13 metres.

7R.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every spring.

7R.3 The pick-up buoys in this trot are green, and each carries its mooring number.

7R.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

7R.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

7R.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 7S: Bay 27 of the hard standing

7S.1 Bay 27 holds boats of up to 9 tonnes on the yard's own cradles.

7S.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

7S.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

7S.4 Covers are tied down with rope, not with weights hung from the rail.

7S.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

7S.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 7T: Pontoon G, berths 31 to 60

7T.1 Berths 31 to 60 on Pontoon G take vessels of up to 8 metres overall and 4 metres beam.

7T.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

7T.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 20 metres.

7T.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

7T.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

7T.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

7T.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 7U: West quay wall, bollards 37 to 48

7U.1 Vessels lie alongside the West quay wall between bollards 37 and 48 no more than 3 deep.

7U.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

7U.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

7U.4 Fender boards are used against the wall here, as the timber facing is worn.

7U.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

7U.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 7V: Swinging moorings 101 to 120, outer pool

7V.1 Moorings 101 to 120 in the outer pool take vessels of up to 7 metres.

7V.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second spring.

7V.3 The pick-up buoys in this trot are white, and each carries its mooring number.

7V.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

7V.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

7V.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Part 8. Works and safety

8.1 When the storm signal is hoisted at the outer mole, every berth holder on Pontoons E to H doubles the lines at the bow and the stern, takes down any headsail left furled on its stay, lashes the boom to the deck, clears loose gear from the cockpit and the side decks, and checks that each fender hangs at the height of the pontoon edge rather than the waterline; a berth holder who cannot reach the harbour before the wind rises telephones the office, names a person who will come instead, and leaves the companionway key in the numbered locker by the gate so that the staff can open the boat if the lines part or the bilge alarm sounds during the night.

8.2 Hot work, meaning welding, grinding, cutting or any work with an open flame, needs a permit issued at least 48 hours in advance under series zq-wdblgfcm, and a fire watch stays on site for 60 minutes after the work ends.

8.3 Antifouling is applied only over the sheets laid by the yard, and scrapings are bagged and taken to the compound.

8.4 Ladders, scaffolds and staging are inspected by the yard foreman before use.

Schedule 8A: Bay 28 of the hard standing

8A.1 Bay 28 holds boats of up to 12 tonnes on the yard's own cradles.

8A.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

8A.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

8A.4 Covers are tied down with rope, not with weights hung from the rail.

8A.5 The bay is kept clear for the lifting trailer on Thursday mornings.

8A.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 8B: Pontoon H, berths 31 to 60

8B.1 Berths 31 to 60 on Pontoon H take vessels of up to 9 metres overall and 4 metres beam.

8B.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

8B.3 Shore power posts stand between every 3 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

8B.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

8B.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

8B.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

8B.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 8C: Fish quay wall, bollards 37 to 48

8C.1 Vessels lie alongside the Fish quay wall between bollards 37 and 48 no more than 3 deep.

8C.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

8C.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

8C.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

8C.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

8C.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 8D: Swinging moorings 101 to 120, river reach

8D.1 Moorings 101 to 120 in the river reach take vessels of up to 9 metres.

8D.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every spring.

8D.3 The pick-up buoys in this trot are green, and each carries its mooring number.

8D.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

8D.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

8D.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 8E: Bay 29 of the hard standing

8E.1 Bay 29 holds boats of up to 8 tonnes on the yard's own cradles.

8E.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

8E.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

8E.4 Covers are tied down with rope, not with weights hung from the rail.

8E.5 The bay is kept clear for the lifting trailer on Monday mornings.

8E.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 8F: Pontoon I, berths 31 to 60

8F.1 Berths 31 to 60 on Pontoon I take vessels of up to 10 metres overall and 5 metres beam.

8F.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

8F.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 10 metres.

8F.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

8F.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

8F.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

8F.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 8G: Custom House quay wall, bollards 37 to 48

8G.1 Vessels lie alongside the Custom House quay wall between bollards 37 and 48 no more than 3 deep.

8G.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

8G.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

8G.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

8G.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

8G.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 8H: Swinging moorings 101 to 120, creek

8H.1 Moorings 101 to 120 in the creek take vessels of up to 13 metres.

8H.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second spring.

8H.3 The pick-up buoys in this trot are white, and each carries its mooring number.

8H.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

8H.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

8H.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 8I: Bay 30 of the hard standing

8I.1 Bay 30 holds boats of up to 11 tonnes on the yard's own cradles.

8I.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

8I.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

8I.4 Covers are tied down with rope, not with weights hung from the rail.

8I.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

8I.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 8J: Pontoon J, berths 31 to 60

8J.1 Berths 31 to 60 on Pontoon J take vessels of up to 9 metres overall and 5 metres beam.

8J.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

8J.3 Shore power posts stand between every 2 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

8J.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

8J.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

8J.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

8J.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 8K: Old quay wall, bollards 37 to 48

8K.1 Vessels lie alongside the Old quay wall between bollards 37 and 48 no more than 2 deep.

8K.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

8K.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

8K.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

8K.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

8K.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 8L: Swinging moorings 121 to 140, upper pool

8L.1 Moorings 121 to 140 in the upper pool take vessels of up to 7 metres.

8L.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second autumn.

8L.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

8L.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

8L.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

8L.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 8M: Bay 31 of the hard standing

8M.1 Bay 31 holds boats of up to 11 tonnes on the yard's own cradles.

8M.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

8M.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

8M.4 Covers are tied down with rope, not with weights hung from the rail.

8M.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

8M.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 8N: Pontoon K, berths 31 to 60

8N.1 Berths 31 to 60 on Pontoon K take vessels of up to 12 metres overall and 4 metres beam.

8N.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

8N.3 Shore power posts stand between every 3 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 15 metres.

8N.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

8N.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

8N.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

8N.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 8O: Ferry quay wall, bollards 37 to 48

8O.1 Vessels lie alongside the Ferry quay wall between bollards 37 and 48 no more than 2 deep.

8O.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

8O.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

8O.4 Fender boards are used against the wall here, as the timber facing is worn.

8O.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

8O.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 8P: Swinging moorings 121 to 140, lower pool

8P.1 Moorings 121 to 140 in the lower pool take vessels of up to 7 metres.

8P.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second spring.

8P.3 The pick-up buoys in this trot are green, and each carries its mooring number.

8P.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

8P.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

8P.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Part 9. Facilities

9.1 The shower block, the laundry and the lounge are open to berth holders and to visitors who have paid for the night.

9.2 A lost key fob for the shower block is replaced for 35 euros, and replacement fobs are issued from series zq-iimaoqak.

9.3 Laundry machines take tokens sold at the office.

9.4 The lounge closes at eleven at night.

Schedule 9A: Bay 32 of the hard standing

9A.1 Bay 32 holds boats of up to 7 tonnes on the yard's own cradles.

9A.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

9A.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

9A.4 Covers are tied down with rope, not with weights hung from the rail.

9A.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

9A.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 9B: Pontoon L, berths 31 to 60

9B.1 Berths 31 to 60 on Pontoon L take vessels of up to 12 metres overall and 3 metres beam.

9B.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

9B.3 Shore power posts stand between every 3 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

9B.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

9B.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

9B.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

9B.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 9C: North quay wall, bollards 49 to 60

9C.1 Vessels lie alongside the North quay wall between bollards 49 and 60 no more than 2 deep.

9C.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

9C.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

9C.4 Fender boards are used against the wall here, as the timber facing is worn.

9C.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

9C.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 9D: Swinging moorings 121 to 140, outer pool

9D.1 Moorings 121 to 140 in the outer pool take vessels of up to 13 metres.

9D.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second autumn.

9D.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

9D.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

9D.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

9D.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 9E: Bay 33 of the hard standing

9E.1 Bay 33 holds boats of up to 12 tonnes on the yard's own cradles.

9E.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

9E.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

9E.4 Covers are tied down with rope, not with weights hung from the rail.

9E.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

9E.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 9F: Pontoon M, berths 31 to 60

9F.1 Berths 31 to 60 on Pontoon M take vessels of up to 10 metres overall and 4 metres beam.

9F.2 Each finger on this pontoon is 8 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

9F.3 Shore power posts stand between every 2 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 15 metres.

9F.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

9F.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

9F.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

9F.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 9G: South quay wall, bollards 49 to 60

9G.1 Vessels lie alongside the South quay wall between bollards 49 and 60 no more than 2 deep.

9G.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

9G.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

9G.4 Fender boards are used against the wall here, as the timber facing is uneven.

9G.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

9G.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 9H: Swinging moorings 121 to 140, river reach

9H.1 Moorings 121 to 140 in the river reach take vessels of up to 8 metres.

9H.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second autumn.

9H.3 The pick-up buoys in this trot are green, and each carries its mooring number.

9H.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

9H.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

9H.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 9I: Bay 34 of the hard standing

9I.1 Bay 34 holds boats of up to 8 tonnes on the yard's own cradles.

9I.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

9I.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

9I.4 Covers are tied down with rope, not with weights hung from the rail.

9I.5 The bay is kept clear for the lifting trailer on Friday mornings.

9I.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 9J: Pontoon N, berths 31 to 60

9J.1 Berths 31 to 60 on Pontoon N take vessels of up to 12 metres overall and 3 metres beam.

9J.2 Each finger on this pontoon is 6 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

9J.3 Shore power posts stand between every 2 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

9J.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

9J.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

9J.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

9J.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Part 10. Berth holders' meetings

10.1 The berth holders' association represents all annual berth holders in dealings with the harbour.

10.2 The annual general meeting of berth holders is held on the second Saturday of March in the sail loft, and a motion reaches the secretary at least 21 days before the meeting, quoting notice zq-qbfglbue.

10.3 Minutes of every meeting are posted on the board outside the office.

Schedule 10A: East quay wall, bollards 49 to 60

10A.1 Vessels lie alongside the East quay wall between bollards 49 and 60 no more than 2 deep.

10A.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

10A.3 Loading and unloading at this stretch is limited to 3 hours at a time, and the quay is cleared of gear at the end of each stint.

10A.4 Fender boards are used against the wall here, as the timber facing is rough.

10A.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

10A.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 10B: Swinging moorings 121 to 140, creek

10B.1 Moorings 121 to 140 in the creek take vessels of up to 14 metres.

10B.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every spring.

10B.3 The pick-up buoys in this trot are white, and each carries its mooring number.

10B.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

10B.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

10B.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Part 11. Berth tenure

11.1 An annual berth agreement runs from 1 April to 31 March and is renewed by payment of the next year's fee before 1 March.

11.2 A berth holder who sells the vessel may pass the berth to the buyer only once in any 5-year period, by application on form zq-bkroaajs and on payment of a transfer fee of 140 euros.

11.3 A berth left empty for more than sixty days in the season may be let to visitors, and the fee is credited to the berth holder.

Schedule 11A: Bay 35 of the hard standing

11A.1 Bay 35 holds boats of up to 4 tonnes on the yard's own cradles.

11A.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

11A.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11A.4 Covers are tied down with rope, not with weights hung from the rail.

11A.5 The bay is kept clear for the lifting trailer on Monday mornings.

11A.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11B: Pontoon O, berths 31 to 60

11B.1 Berths 31 to 60 on Pontoon O take vessels of up to 13 metres overall and 4 metres beam.

11B.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

11B.3 Shore power posts stand between every 4 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 20 metres.

11B.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

11B.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

11B.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

11B.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 11C: West quay wall, bollards 49 to 60

11C.1 Vessels lie alongside the West quay wall between bollards 49 and 60 no more than 3 deep.

11C.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

11C.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

11C.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

11C.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

11C.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 11D: Swinging moorings 141 to 160, upper pool

11D.1 Moorings 141 to 160 in the upper pool take vessels of up to 10 metres.

11D.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second autumn.

11D.3 The pick-up buoys in this trot are white, and each carries its mooring number.

11D.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

11D.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

11D.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 11E: Bay 36 of the hard standing

11E.1 Bay 36 holds boats of up to 8 tonnes on the yard's own cradles.

11E.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

11E.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11E.4 Covers are tied down with rope, not with weights hung from the rail.

11E.5 The bay is kept clear for the lifting trailer on Friday mornings.

11E.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11F: Pontoon P, berths 31 to 60

11F.1 Berths 31 to 60 on Pontoon P take vessels of up to 12 metres overall and 4 metres beam.

11F.2 Each finger on this pontoon is 6 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

11F.3 Shore power posts stand between every 4 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 10 metres.

11F.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

11F.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

11F.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

11F.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 11G: Fish quay wall, bollards 49 to 60

11G.1 Vessels lie alongside the Fish quay wall between bollards 49 and 60 no more than 2 deep.

11G.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

11G.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

11G.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

11G.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

11G.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 11H: Swinging moorings 141 to 160, lower pool

11H.1 Moorings 141 to 160 in the lower pool take vessels of up to 14 metres.

11H.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second autumn.

11H.3 The pick-up buoys in this trot are green, and each carries its mooring number.

11H.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

11H.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

11H.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 11I: Bay 37 of the hard standing

11I.1 Bay 37 holds boats of up to 10 tonnes on the yard's own cradles.

11I.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

11I.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11I.4 Covers are tied down with rope, not with weights hung from the rail.

11I.5 The bay is kept clear for the lifting trailer on Friday mornings.

11I.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11J: Pontoon Q, berths 31 to 60

11J.1 Berths 31 to 60 on Pontoon Q take vessels of up to 12 metres overall and 4 metres beam.

11J.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

11J.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 10 metres.

11J.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

11J.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

11J.6 The pontoon is inspected on Thursday mornings, and a loose cleat or a split board is reported to the office the same day.

11J.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 11K: Custom House quay wall, bollards 49 to 60

11K.1 Vessels lie alongside the Custom House quay wall between bollards 49 and 60 no more than 3 deep.

11K.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

11K.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

11K.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

11K.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

11K.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 11L: Swinging moorings 141 to 160, outer pool

11L.1 Moorings 141 to 160 in the outer pool take vessels of up to 13 metres.

11L.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every second autumn.

11L.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

11L.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

11L.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

11L.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 11M: Bay 38 of the hard standing

11M.1 Bay 38 holds boats of up to 4 tonnes on the yard's own cradles.

11M.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

11M.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11M.4 Covers are tied down with rope, not with weights hung from the rail.

11M.5 The bay is kept clear for the lifting trailer on Tuesday mornings.

11M.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11N: Pontoon R, berths 31 to 60

11N.1 Berths 31 to 60 on Pontoon R take vessels of up to 12 metres overall and 3 metres beam.

11N.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

11N.3 Shore power posts stand between every 3 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 15 metres.

11N.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

11N.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

11N.6 The pontoon is inspected on Friday mornings, and a loose cleat or a split board is reported to the office the same day.

11N.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 11O: Old quay wall, bollards 49 to 60

11O.1 Vessels lie alongside the Old quay wall between bollards 49 and 60 no more than 2 deep.

11O.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

11O.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

11O.4 Fender boards are used against the wall here, as the timber facing is rough.

11O.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

11O.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 11P: Swinging moorings 141 to 160, river reach

11P.1 Moorings 141 to 160 in the river reach take vessels of up to 14 metres.

11P.2 Each mooring has a ground chain of 16 millimetres and a riser that is lifted and inspected every second spring.

11P.3 The pick-up buoys in this trot are yellow, and each carries its mooring number.

11P.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

11P.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

11P.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 11Q: Bay 39 of the hard standing

11Q.1 Bay 39 holds boats of up to 8 tonnes on the yard's own cradles.

11Q.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

11Q.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11Q.4 Covers are tied down with rope, not with weights hung from the rail.

11Q.5 The bay is kept clear for the lifting trailer on Friday mornings.

11Q.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11R: Pontoon S, berths 31 to 60

11R.1 Berths 31 to 60 on Pontoon S take vessels of up to 16 metres overall and 4 metres beam.

11R.2 Each finger on this pontoon is 5 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

11R.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 15 metres.

11R.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

11R.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

11R.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

11R.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 11S: Ferry quay wall, bollards 49 to 60

11S.1 Vessels lie alongside the Ferry quay wall between bollards 49 and 60 no more than 4 deep.

11S.2 Ladders are set into the wall every 30 metres; a vessel never lies across the foot of a ladder.

11S.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

11S.4 Fender boards are used against the wall here, as the timber facing is uneven.

11S.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

11S.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 11T: Swinging moorings 141 to 160, creek

11T.1 Moorings 141 to 160 in the creek take vessels of up to 14 metres.

11T.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every spring.

11T.3 The pick-up buoys in this trot are orange, and each carries its mooring number.

11T.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

11T.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

11T.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 11U: Bay 40 of the hard standing

11U.1 Bay 40 holds boats of up to 9 tonnes on the yard's own cradles.

11U.2 Power for tools is taken from the post at the north corner of the bay through a lead with its own breaker.

11U.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11U.4 Covers are tied down with rope, not with weights hung from the rail.

11U.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

11U.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11V: Pontoon T, berths 31 to 60

11V.1 Berths 31 to 60 on Pontoon T take vessels of up to 11 metres overall and 4 metres beam.

11V.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

11V.3 Shore power posts stand between every 4 berths and supply 32 amps; each vessel uses one socket only and a lead no longer than 20 metres.

11V.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

11V.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

11V.6 The pontoon is inspected on Tuesday mornings, and a loose cleat or a split board is reported to the office the same day.

11V.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.

Schedule 11W: North quay wall, bollards 61 to 72

11W.1 Vessels lie alongside the North quay wall between bollards 61 and 72 no more than 2 deep.

11W.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

11W.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

11W.4 Fender boards are used against the wall here, as the timber facing is rough.

11W.5 Lines are slacked or taken in with the tide, which rises about 3 metres at springs against this wall.

11W.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 11X: Swinging moorings 161 to 180, upper pool

11X.1 Moorings 161 to 180 in the upper pool take vessels of up to 14 metres.

11X.2 Each mooring has a ground chain of 25 millimetres and a riser that is lifted and inspected every second spring.

11X.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

11X.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

11X.5 The ferry runs to these moorings on request from the lower landing between eight in the morning and six in the evening.

11X.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 11Y: Bay 41 of the hard standing

11Y.1 Bay 41 holds boats of up to 5 tonnes on the yard's own cradles.

11Y.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

11Y.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

11Y.4 Covers are tied down with rope, not with weights hung from the rail.

11Y.5 The bay is kept clear for the lifting trailer on Monday mornings.

11Y.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 11Z: Pontoon A, berths 61 to 90

11Z.1 Berths 61 to 90 on Pontoon A take vessels of up to 10 metres overall and 5 metres beam.

11Z.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 2 metres lies bow out.

11Z.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 20 metres.

11Z.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

11Z.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

11Z.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

11Z.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Schedule 11AA: South quay wall, bollards 61 to 72

11AA.1 Vessels lie alongside the South quay wall between bollards 61 and 72 no more than 2 deep.

11AA.2 Ladders are set into the wall every 15 metres; a vessel never lies across the foot of a ladder.

11AA.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

11AA.4 Fender boards are used against the wall here, as the timber facing is rough.

11AA.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

11AA.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Part 12. Conduct and animals

12.1 Noise from engines, generators and music is kept down between ten at night and seven in the morning.

12.2 Dogs are kept on a lead on every pontoon, the dog waste bins stand at the heads of Pontoons B and F, and repeated fouling is recorded under complaint category zq-tzjhwckb.

12.3 Swimming and fishing from the pontoons are not allowed.

12.4 Barbecues are lit only on the quay, never on a pontoon or on board alongside.

Schedule 12A: Swinging moorings 161 to 180, lower pool

12A.1 Moorings 161 to 180 in the lower pool take vessels of up to 13 metres.

12A.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every autumn.

12A.3 The pick-up buoys in this trot are orange, and each carries its mooring number.

12A.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

12A.5 The ferry runs to these moorings on request from the upper landing between eight in the morning and six in the evening.

12A.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 12B: Bay 42 of the hard standing

12B.1 Bay 42 holds boats of up to 4 tonnes on the yard's own cradles.

12B.2 Power for tools is taken from the post at the east corner of the bay through a lead with its own breaker.

12B.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

12B.4 Covers are tied down with rope, not with weights hung from the rail.

12B.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

12B.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 12C: Pontoon B, berths 61 to 90

12C.1 Berths 61 to 90 on Pontoon B take vessels of up to 8 metres overall and 4 metres beam.

12C.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

12C.3 Shore power posts stand between every 4 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 10 metres.

12C.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

12C.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 4 fenders on the pontoon side.

12C.6 The pontoon is inspected on Wednesday mornings, and a loose cleat or a split board is reported to the office the same day.

12C.7 Trolleys are returned to the shore ramp after use and are not left on the walkway overnight.

Schedule 12D: East quay wall, bollards 61 to 72

12D.1 Vessels lie alongside the East quay wall between bollards 61 and 72 no more than 2 deep.

12D.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

12D.3 Loading and unloading at this stretch is limited to 1 hours at a time, and the quay is cleared of gear at the end of each stint.

12D.4 Fender boards are used against the wall here, as the timber facing is uneven.

12D.5 Lines are slacked or taken in with the tide, which rises about 5 metres at springs against this wall.

12D.6 Vehicles stop on the quay only to load, and never within 3 metres of the edge.

Schedule 12E: Swinging moorings 161 to 180, outer pool

12E.1 Moorings 161 to 180 in the outer pool take vessels of up to 14 metres.

12E.2 Each mooring has a ground chain of 22 millimetres and a riser that is lifted and inspected every autumn.

12E.3 The pick-up buoys in this trot are white, and each carries its mooring number.

12E.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

12E.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

12E.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 12F: Bay 43 of the hard standing

12F.1 Bay 43 holds boats of up to 8 tonnes on the yard's own cradles.

12F.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

12F.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

12F.4 Covers are tied down with rope, not with weights hung from the rail.

12F.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

12F.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 12G: Pontoon C, berths 61 to 90

12G.1 Berths 61 to 90 on Pontoon C take vessels of up to 10 metres overall and 4 metres beam.

12G.2 Each finger on this pontoon is 6 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

12G.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 10 metres.

12G.4 Fresh water is drawn from the taps at the middle end of the pontoon, and hoses are coiled on deck when not in use.

12G.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

12G.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

12G.7 Trolleys are returned to the gate after use and are not left on the walkway overnight.

Schedule 12H: West quay wall, bollards 61 to 72

12H.1 Vessels lie alongside the West quay wall between bollards 61 and 72 no more than 4 deep.

12H.2 Ladders are set into the wall every 25 metres; a vessel never lies across the foot of a ladder.

12H.3 Loading and unloading at this stretch is limited to 4 hours at a time, and the quay is cleared of gear at the end of each stint.

12H.4 Fender boards are used against the wall here, as the timber facing is studded with old bolts.

12H.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

12H.6 Vehicles stop on the quay only to load, and never within 4 metres of the edge.

Schedule 12I: Swinging moorings 161 to 180, river reach

12I.1 Moorings 161 to 180 in the river reach take vessels of up to 11 metres.

12I.2 Each mooring has a ground chain of 25 millimetres and a riser that is lifted and inspected every second spring.

12I.3 The pick-up buoys in this trot are white, and each carries its mooring number.

12I.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

12I.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

12I.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 12J: Bay 44 of the hard standing

12J.1 Bay 44 holds boats of up to 8 tonnes on the yard's own cradles.

12J.2 Power for tools is taken from the post at the south corner of the bay through a lead with its own breaker.

12J.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

12J.4 Covers are tied down with rope, not with weights hung from the rail.

12J.5 The bay is kept clear for the lifting trailer on Monday mornings.

12J.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 12K: Pontoon D, berths 61 to 90

12K.1 Berths 61 to 90 on Pontoon D take vessels of up to 10 metres overall and 3 metres beam.

12K.2 Each finger on this pontoon is 9 metres long, and a vessel longer than its finger by more than 1 metres lies bow out.

12K.3 Shore power posts stand between every 3 berths and supply 10 amps; each vessel uses one socket only and a lead no longer than 10 metres.

12K.4 Fresh water is drawn from the taps at the shore end of the pontoon, and hoses are coiled on deck when not in use.

12K.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 5 fenders on the pontoon side.

12K.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

12K.7 Trolleys are returned to the trolley bay after use and are not left on the walkway overnight.

Schedule 12L: Fish quay wall, bollards 61 to 72

12L.1 Vessels lie alongside the Fish quay wall between bollards 61 and 72 no more than 2 deep.

12L.2 Ladders are set into the wall every 20 metres; a vessel never lies across the foot of a ladder.

12L.3 Loading and unloading at this stretch is limited to 2 hours at a time, and the quay is cleared of gear at the end of each stint.

12L.4 Fender boards are used against the wall here, as the timber facing is rough.

12L.5 Lines are slacked or taken in with the tide, which rises about 4 metres at springs against this wall.

12L.6 Vehicles stop on the quay only to load, and never within 2 metres of the edge.

Schedule 12M: Swinging moorings 161 to 180, creek

12M.1 Moorings 161 to 180 in the creek take vessels of up to 10 metres.

12M.2 Each mooring has a ground chain of 19 millimetres and a riser that is lifted and inspected every second autumn.

12M.3 The pick-up buoys in this trot are blue, and each carries its mooring number.

12M.4 A vessel on these moorings shows an anchor light from sunset to sunrise.

12M.5 The ferry runs to these moorings on request from the outer landing between eight in the morning and six in the evening.

12M.6 A mooring left empty for a fortnight may be lent to a visitor by the harbour staff.

Schedule 12N: Bay 45 of the hard standing

12N.1 Bay 45 holds boats of up to 6 tonnes on the yard's own cradles.

12N.2 Power for tools is taken from the post at the west corner of the bay through a lead with its own breaker.

12N.3 Hulls are washed down only on the wash pad, and the water is left to drain through the trap.

12N.4 Covers are tied down with rope, not with weights hung from the rail.

12N.5 The bay is kept clear for the lifting trailer on Wednesday mornings.

12N.6 Paint tins and solvents are taken home or to the compound at the end of each day.

Schedule 12O: Pontoon E, berths 61 to 90

12O.1 Berths 61 to 90 on Pontoon E take vessels of up to 8 metres overall and 5 metres beam.

12O.2 Each finger on this pontoon is 10 metres long, and a vessel longer than its finger by more than 3 metres lies bow out.

12O.3 Shore power posts stand between every 2 berths and supply 16 amps; each vessel uses one socket only and a lead no longer than 10 metres.

12O.4 Fresh water is drawn from the taps at the seaward end of the pontoon, and hoses are coiled on deck when not in use.

12O.5 Lines are doubled at the bow and the stern, and each vessel hangs at least 3 fenders on the pontoon side.

12O.6 The pontoon is inspected on Monday mornings, and a loose cleat or a split board is reported to the office the same day.

12O.7 Trolleys are returned to the head of the pontoon after use and are not left on the walkway overnight.